Rosco FlexCoat sample — test the flexible coating on your foam
A 2 oz sample of Rosco FlexCoat (7120), the water-based acrylic coating that dries tough but slightly elastic. Coat a piece of your foam and check flex, finish and paint adhesion before ordering 3.8 L or 19 L.

Image: Rosco
See how it flexes on your foam
FlexCoat is for foam pieces that bend, squeeze or get knocked about. A sample lets you check it on your own foam first.
- Enough to coat a small test piece
- Check flexibility once cured
- Check paint adhesion over the coating
- Check build with two or three coats
What to test
Soft foam props & rocks
Squeezable, interactive and touring pieces that need to flex.
Foam costumes
Lightweight foam builds that need a paintable surface.
Paint adhesion
Check that your scenic paint sits well on cured FlexCoat.
What it is — and what it isn’t
Use it for
- Trialling FlexCoat on foam offcuts
- Checking flex, finish and paint adhesion
- Testing coat count before buying full size
Don’t use it for
- A rigid hard shell — look at FoamCoat
- Clear finishes — look at CrystalGel
- Coating a whole piece — order full size
Testing a sample
- Stir the sample thoroughly.
- Brush onto a foam offcut — thin the first coat slightly on open-cell foam.
- Allow 1–8 hours between coats, depending on thickness and conditions; two coats is typical.
- Allow about 24 hours to cure before flexing hard or painting.
- Check flex and paint adhesion, then order full size.
Key details
| Product | Rosco FlexCoat |
|---|---|
| Product code | 7120 |
| Size | 2 oz sample |
| Type | Water-based acrylic coating — tough but slightly elastic |
| Clean-up | Soap and water while wet |
| Full sizes | 3.8 L and 19 L |
Common questions
What should I test with the FlexCoat sample?
Coat an offcut of the foam you’ll use, let it cure, then flex it and paint it to check the coating suits the job.
FlexCoat vs FoamCoat?
FlexCoat stays slightly elastic for foam that needs to bend. FoamCoat gives a rigid, hard shell on rigid foam.
How long does FlexCoat take to cure?
Allow 1–8 hours between coats and about 24 hours to fully cure before heavy handling or top-coating, depending on thickness and conditions.
How far will 2 oz go?
Only a small test piece. The full size covers approximately 23–28 m² per 3.79 L as a guide — actual coverage varies with substrate, coats, dilution and application.
Always test on your actual foam first — performance depends on substrate, coat thickness and cure conditions. Coverage is a guide only — it varies with substrate, coats, dilution and application. Information is a guide only.
Related products
Ready for the full-size product?
Tell us what you’re working on and we’ll point you to the right product for the job.